Ownership and technical information for the The Change Order, hull number SERP1748B292 which is owned by Gerald Schierding. It hails from Osage Beach Missouri.
The The Change Order
Hull Num: SERP1748B292
- Type: Recreational
- Year Built: 1992 in Palm Coast Flagler Fl
- Gross Tonnage: 37
- Net Tonnage: 30
- Length: 50.1
- Breadth: 15
- Depth: 7.5
- Measured By: Unspecified
- Hailing Port: Osage Beach Missouri
- Owner: Gerald Schierding
- Contact At: 122 Town Parc Drive
Foristell Missouri 63348 - Hull: FRP (Fiberglass)
- Hull Configuration: Monohull
- Hull Shape: Ship
- Ship Yard: Gulfwind Products Inc
- Ship Builder: Gulfwind Products Inc
- Cite As: https://www.falship.com/ship/the-change-order-110568203
- View other vessels from Osage Beach