The Critical Path is made of fRP (Fiberglass), weighs in at 19 tons, measures 45.3 in length and extends 6.6 in depth. It hails from Sarasota Florida.
The Critical Path
- Type: Recreational
- Year Built: 1989 in France
- Gross Tonnage: 22
- Net Tonnage: 19
- Length: 45.3
- Breadth: 14.8
- Depth: 6.6
- Measured By: Unspecified
- Call Sign: WCX4368
- Hailing Port: Sarasota Florida
- Company: Critical Path Leasing LLC
- Contact At: 1444 First St (sarasota Fl) Po Box 2556
Highlands North Carolina 28741 - Hull: FRP (Fiberglass)
- Hull Configuration: Monohull
- Hull Shape: Sail (distinct Keel)
- Cite As: https://www.falship.com/ship/critical-path-110470963
- View other vessels from Sarasota