Ownership and technical information for the Change Order I, hull number FGQ35610D101 which is owned by Paul Frazier. It hails from Breckenridge Tennessee.
The Change Order I
Hull Num: FGQ35610D101
- Type: Recreational
- Year Built: 2001 in Washington North Carolina
- Gross Tonnage: 9
- Net Tonnage: 7
- Length: 35
- Breadth: 8.3
- Depth: 4.7
- Measured By: Unspecified
- Hailing Port: Breckenridge Tennessee
- Owner: Paul Frazier
- Contact At: 3686 Mary Oaks Drive
Memphis Tennessee 38133 - Hull: FRP (Fiberglass)
- Hull Configuration: Monohull
- Hull Shape: Ship
- Ship Yard: Fountain Powerboats Inc
- Ship Builder: Fountain Powerboats Inc
- Cite As: https://www.falship.com/ship/change-order-i-111127083
- View other vessels from Breckenridge