Ownership and technical information for the Change Order, hull number RWB010510376 which is owned by R Palmateer. It hails from San Diego California.
The Change Order
Hull Num: RWB010510376
- Type: Recreational
- Gross Tonnage: 17
- Net Tonnage: 13
- Length: 35.8
- Breadth: 11.8
- Depth: 6.1
- Measured By: Unspecified
- Hailing Port: San Diego California
- Owner: R Palmateer
- Contact At: 2726 Shelter Island Dr #387
San Diego California 92106 - Hull: FRP (Fiberglass)
- Hull Configuration: Monohull
- Hull Shape: Ship
- Cite As: https://www.falship.com/ship/change-order-19336193
- View other vessels from San Diego