The Change Order, hull number BERP0929J586 is made of fRP (Fiberglass), weighs in at 31 tons, measures 46 in length and extends 8.3 in depth. It hails from Orange Beach Alabama.
The Change Order
Hull Num: BERP0929J586
- Type: Recreational
- Year Built: 1986 in Miami Fl
- Gross Tonnage: 39
- Net Tonnage: 31
- Length: 46
- Breadth: 15.5
- Depth: 8.3
- Measured By: Unspecified
- Hailing Port: Orange Beach Alabama
- Company: Coker & Coker Properties LLC
- Contact At: 10052 Gallop Rd
Aberdeen Mississippi 39730 - Hull: FRP (Fiberglass)
- Hull Configuration: Monohull
- Hull Shape: Ship
- Ship Yard: Bertram Yacht
- Ship Builder: Bertram Yacht
- Cite As: https://www.falship.com/ship/change-order-19117903
- View other vessels from Orange Beach