Ownership and technical information for the Change Order, hull number GFNCY019G708 which is owned by John Eldredge. It hails from Peyton Colorado.
The Change Order
Hull Num: GFNCY019G708
- Type: Recreational
- Year Built: 2007 in Cadillac Michigan
- Gross Tonnage: 8
- Net Tonnage: 6
- Length: 28.2
- Breadth: 8.3
- Depth: 5.3
- Measured By: Unspecified
- Hailing Port: Peyton Colorado
- Owner: John Eldredge
- Contact At: 17855 Pinon Park Road
Peyton Colorado 80831 - Hull: FRP (Fiberglass)
- Hull Configuration: Monohull
- Hull Shape: Ship
- Ship Builder: Four Winns Boats LLC
- Cite As: https://www.falship.com/ship/change-order-112330773
- View other vessels from Peyton